Seabreeze
Segmental
Bridge

Bridge over Cape Fear River Being
Built in
Wetlands

Sidney Lanier
Cable-Stayed Bridge
|
Bridge
Structures
GLF
has constructed numerous high profile structures including the Sidney
Lanier Cable-Stayed Bridge, Seabreeze Segmental Box Girder Bridges and
the Hallandale Beach Boulevard Twin Bascule Bridges. We have completed
projects in nearly all structure classifications including cable-stayed,
precast concrete segmental, cast-in-place concrete segmental, steel
girder, prestressed concrete girder, post-tensioned concrete girder,
as well as numerous complex bascule structures.
Bridge
construction locations have included environmentally sensitive areas
as well as urban and rural areas. The various structures include high
level, medium and low level fixed span bridges, flyovers and movable
structures.
The
GLF team stays well informed of the latest developments in technology
and construction materials, both of which allow us to improve our construction
methods and exceed the specifications.
|

Victory Bridge Built in
Environmental Sensitive
Area

Hallandale Beach
Twin Bascule Bridges

Hallandale Beach
Cast in Place Box Girders
|
 |

Sidney Lanier
Deep Coffercells

Port of Tampa, Berth 212,
Pile Driving

BNSF, Drilled Shaft
Foundations |
Heavy
Foundations
All
structures require solid foundations. The GLF team has some of the most
experienced foundation construction personnel in the business. GLF has
constructed numerous mass concrete foundations for large bridges and
bascule structures.
Construction
of foundations in deep waters, ocean tides, large temperature differentials
and swift currents is the norm for GLF personnel.
Our
specialties include caissons, deep cell cofferdams, drilled shafts,
concrete and steel piles, as well as mass concrete footings and piers.
Other foundations include steel sheet pile installations with tieback
systems and steel and concrete cylinder piles.
At
GLF, we look forward to constructing foundations out of the ordinary.
We have value-engineered foundations on several projects saving the
clients both time and money during the construction process. GLF can
extend to our clients a high level of confidence that projects will
be completed on time and within budget, using the most effective methods
in the business.
|

Victory Bridge built in
Environmental Sensitive
Area
|
 |
Berth 30,
Port Everglades
Venetian Causeway
Bascule Bridge
Pier 5B,
Seabreeze Bridge
|
Port
& Marine Works
GLF
Construction Corporation has completed numerous port and marine projects
all over the world. Clients include federal, state and local governments,
as well as private entities engaged in the maritime business.
The
experience of the GLF team encompasses all aspects of marine work
including piers, bulkheads, jetties and walls, as well as subaqueous
pipelines. Specific types of projects include cruise ship, container,
gas and bulk handling facilities.
Working
in the marine environment requires a specialized expertise and knowledge
not typically found in landside projects. Most of our clients' projects
are unique and, as such, can be benefited by GLF's experienced personnel
coupled with a clear vision of what is required for the performance
of the work.

|
Berth 212,
Port of Tampa
Sidney Lanier Bridge,
Foundations & Rock
Revetment Islands
|
|
|
DART - BNSF railroad
steel girder bridge
DART G2 Guideway
at Crossing
|
Light
Rail Structures
GLF
has constructed light rail projects involving at-grade facilities, elevated
structures, and special structures over major freeways, railroad crossings
and environmentally sensitive areas. Included in the construction are
the stations and all appurtenances required to provide a complete facility.
Light
rail construction requires a special team approach to the projects.
Typically, construction is spread over miles of terrain in urban and
rural settings requiring expert coordination and proven construction
methods in order to meet important milestones and tight schedules.
|
DART G2 Project,
Passenger Station
DART NC-3
Wallnut Hill Bridge
|
 |

Venetian Causeway,
Miami, Florida
|
Structural
&
Historical
Renovation
GLF
Construction Corporation has been involved with several structural and
historical restoration projects. Most recently, GLF reconstructed the
Venetian Causeway Bridge to resemble its original 1926 motif. Following
numerous community meetings and design proposals, the public elected
to restore as much of the structure to its original condition as was
possible.
Structural
restoration and repairs are complex processes presenting unique challenges
very different from the field of new construction. GLF has proven to
its clients, on several projects, that it has the experience, knowledge
and craftsmanship to perform detailed restoration work.
|
Venetian Causeway,
Era Historical Lighting
Venetian Causeway ,
Setting Historical
Arch Girders
|
 |
Blair Stone Parkway
Tallahassee, Florida

Intervention to
protect Venice Lagoons,
Venice, Italy
|
Design-Build
Design-build
is one of many alternative methods of project delivery. GLF has been
active in the design-build arena for many years in Europe. In recent
years, the United States public sector market has begun to utilize this
method of procurement. GLF, drawing upon its international experience
as well as its local ties to the professional engineering industry,
is ready to respond to its clients' needs for this method of contracting.
The
benefits of the design-build method of delivery include a shortened
project schedule, single source accountability, overall cost savings,
improved risk management, improved quality and less management personnel
required by the Owner.
GLF
has been involved in numerous areas of the design-build market including
bridges, high speed railroads, buildings and transit light rail systems.
|
Ras Laffan Port
Quatar

High Speed Railway
Milan-Bologna , Italy
|
 |
Royal Lexington
Apartments
Lexington, Kentucky
State Road 688
Reconstruction
Largo, Florida
|
General
Contracting
General
contracting requires that a construction organization possess the necessary
experience in all phases of construction and the ability to utilize
diverse project teams effectively. GLF possesses those types of abilities
with its international team of engineers and construction personnel.
At
GLF, the process begins with a thorough evaluation of the project by
identifying potential problems, the associated risks and impediments
to a successful project.
GLF's
general contracting experience includes commercial and residential buildings,
condominiums, industrial facilities, machinery installations, utilities,
dams and tunnels.
|
Fuel Farm Construction
U.S. Coast Guard Station
Opa Locka, Florida

Park Grove Apartments
Hollywood, Florida
|
 |